Engineering practice, async culture, and changelog highlights from the Loop team.
We replaced the 9 a.m. meeting with a 90-second voice note. Six months in, here's what worked and what didn't.
How we shipped voice updates without the latency, the hallucinations, or the storage bill.
Six rules we ended up with after dogfooding the product for a year. Some are obvious, two surprised us.
A 1-line template, three rules, and an honest example. The whole thing fits on a Post-it.